Wedding Day, the motor got married to the chassis. If you've never done a motor change out on one of these bikes, you haven't experienced what a "Tight Fit" is. I had some good, no, great material to go with that last sentence but, after all, this is a family friendly site.
The idea was to get a couple of guys who will do just about anything for beer to do the monkey work.
I used SOHC Forum Member Dino, (Hack a Week) method of installing the motor. My configuration is slightly different from his but it is basically the same means to an end. An "H" Frame is constructed of 2X4s and strapped to the motor in both planes.

I also took Hondaman's advice from his book and ground off the few MM off the top of the lower right mount, yes, that's how tight this fit is. The grind got painted for corrosion only, you can't even tell it was ground off with the motor in the frame.

One thing I do is to sand off the PC on engine mounting surfaces on the frame that have to mount an engine between them. First, it gets rid of the thick powder coat, and second, there is a good ground now.

My crew at work,


The motor in the frame,


Oh, and these Stainless braided lines are real Peaches to get on too. I thought the ones on The Norton resto were tricky, 2 strokes only have a 1/4" plastic tube with a couple of crappy clamps. Ahhhh, simplicity.

Goal is to check out the oil system and see if it is working properly, I don't want to hook up carbs and exhaust until I know the oil system is solid.