Kawi2strokes.com Forum
http://www.kawi2strokes.com/forum/

60 days.....
http://www.kawi2strokes.com/forum/viewtopic.php?f=5&t=2013
Page 1 of 1

Author:  h2racer [ Wed Jan 04, 2012 5:52 pm ]
Post subject:  60 days.....

Getting closer to the 2012 season, just 60 days to go now, and, just 45 till I drive the bikes East.

G31R - Done
Z1R - Heavy frame bracing done and 99% complete
H1R - Top end rebuilt, just need a pipe mod and ready to go
H2R - Getting painted, then ready to go

and the remaining work
TZ - Have the spare parts, cranks and water pump drive, and the top end is re-Nicosiled. Scott is rebuilding it now, then off for carb set up on the dyno
BH - Not started. Scott will rebuild after the TZ
A1R - Is a pile of bits. The frame was broken, so I stripped it down to have it welded. Now at the Powdercoaters and will be rebuilt this weekend
CB - Still waiting for engine parts to arrive

Dang, lots of work to go!

Author:  evansje1 [ Wed Jan 04, 2012 7:10 pm ]
Post subject:  Re: 60 days.....

Good luck and have a safe season of racing, that includes your better half.

I got to meet you'uns at Barber in Oct. while shooting a little video of the pits.

Thanks for the time.

Author:  H2RTuner [ Wed Jan 04, 2012 11:07 pm ]
Post subject:  Re: 60 days.....

Ah, that is real fun, I wish I could go racing with you and Lorraine again.

Page 1 of 1 All times are UTC - 5 hours
Powered by phpBB® Forum Software © phpBB Group
http://www.phpbb.com/