Kawi2strokes.com Forum http://www.kawi2strokes.com/forum/ |
|
60 days..... http://www.kawi2strokes.com/forum/viewtopic.php?f=5&t=2013 |
Page 1 of 1 |
Author: | h2racer [ Wed Jan 04, 2012 5:52 pm ] |
Post subject: | 60 days..... |
Getting closer to the 2012 season, just 60 days to go now, and, just 45 till I drive the bikes East. G31R - Done Z1R - Heavy frame bracing done and 99% complete H1R - Top end rebuilt, just need a pipe mod and ready to go H2R - Getting painted, then ready to go and the remaining work TZ - Have the spare parts, cranks and water pump drive, and the top end is re-Nicosiled. Scott is rebuilding it now, then off for carb set up on the dyno BH - Not started. Scott will rebuild after the TZ A1R - Is a pile of bits. The frame was broken, so I stripped it down to have it welded. Now at the Powdercoaters and will be rebuilt this weekend CB - Still waiting for engine parts to arrive Dang, lots of work to go! |
Author: | evansje1 [ Wed Jan 04, 2012 7:10 pm ] |
Post subject: | Re: 60 days..... |
Good luck and have a safe season of racing, that includes your better half. I got to meet you'uns at Barber in Oct. while shooting a little video of the pits. Thanks for the time. |
Author: | H2RTuner [ Wed Jan 04, 2012 11:07 pm ] |
Post subject: | Re: 60 days..... |
Ah, that is real fun, I wish I could go racing with you and Lorraine again. |
Page 1 of 1 | All times are UTC - 5 hours |
Powered by phpBB® Forum Software © phpBB Group http://www.phpbb.com/ |